Set up shifts, work locations and check-in rules
- Product version
- Web v2.4.1
- Last updated
- 2026-11-22
HR Admin or Company Owner.
- Know each site’s coordinates, or stand at the site with your phone.
Steps
- 1
Open Attendance > Work Locations and click Add location. Enter the Name, Latitude, Longitude and Radius (meters); Use my current position fills the coordinates. 100 to 200 metres is a safe radius.
- 2
Under Allowed networks, add the Wi-Fi name or the office IP range if punches must come from the company network, and choose Flag for review or Refuse the punch for other networks.
Screenshot could not be loaded- 1
- 3
Choose the Geofence policy: Off (location not checked), Flag for review (accepted and marked on the daily report) or Block out-of-range (refused outside every location). 2
Screenshot could not be loaded- 3
- 4
Open Attendance > Shifts. Under Company work schedule, choose the Working days (every other day is the weekend), Default start time, Default end time, Grace period (minutes), Night shift if the day crosses midnight, and the Company timezone. Click Save.
Screenshot could not be loaded- 4
- 5
For teams with other hours, click Add shift: Name, Name (Arabic), Start time, End time, Grace period (minutes), Crosses midnight (overnight shift) and, if it runs on other days, Override working days.
Screenshot could not be loaded- 5
- 6
Click Bulk assign, choose the shift and the Employees, and confirm. Employees are told when a shift is assigned or changed.
Screenshot could not be loaded- 6
- 7
Open Settings > Attendance to set the Attendance policy: Automatic check-out for check-ins nobody closed, Breaks, Check-in and reasons, and whether Payroll reads only validated days. Click Save.
Screenshot could not be loaded- 7
If something goes wrong
| Message or symptom | What to do |
|---|---|
| Fill in the name, coordinates, and radius. | Complete the location, or click Use my current position at the site. |
| The shift ends before it starts. Turn on night shift if it crosses midnight. | Tick Night shift for a working day that crosses midnight, or correct the times. |
| Choose at least one working day. | Tick the days the company works. |
| Failed to delete the shift. Shifts with assignments cannot be deleted. | Move its employees to another shift with Bulk assign, then delete it. |
What comes next
How it flows
Self check-in with geofence
flowchart TD
A[Employee taps Check in] --> A2{Same punch in the last 60 s?}
A2 -- yes --> OK0[Returns the same punch]
A2 -- no --> A3{Approved full-day leave?}
A3 -- yes --> X2[Refused: on leave]
A3 -- no --> B{Month payroll finalized?}
B -- yes --> X[Refused: period locked]
B -- no --> C{Geofence policy}
C -- off --> OK[Punch saved]
C -- flag / block --> D{Location shared?}
D -- no --> Y[Refused: location required]
D -- yes --> E{Inside a work location radius?}
E -- yes --> OK
E -- no, flag --> F[Saved, marked outside fence for HR]
E -- no, block --> Z[Refused: N m away from site]Self check-in with geofence: steps in text
- Employee taps Check in
- Same punch in the last 60 s?
- Same punch in the last 60 s?
- yes Returns the same punch
- no Approved full-day leave?
- Returns the same punch
- Approved full-day leave?
- yes Refused: on leave
- no Month payroll finalized?
- Refused: on leave
- Month payroll finalized?
- yes Refused: period locked
- no Geofence policy
- Refused: period locked
- Geofence policy
- off Punch saved
- flag / block Location shared?
- Punch saved
- Location shared?
- no Refused: location required
- yes Inside a work location radius?
- Refused: location required
- Inside a work location radius?
- yes Punch saved
- no, flag Saved, marked outside fence for HR
- no, block Refused: N m away from site
- Saved, marked outside fence for HR
- Refused: N m away from site
- Lateness is judged against the assigned shift and its grace period, on the company’s own timezone.
- On a night shift, the morning punch closes the shift that started the evening before.
- Tapping Check in twice within a minute does not create a second punch, and you cannot check in on a day of approved leave.
Attendance correction request
flowchart LR
A[Employee: Request correction with a note and proposed times] --> B[Pending · HR and line manager notified]
B --> C{HR answers}
C -- Approve --> D[Proposed times applied as manual punches]
C -- Reject + reply --> E[Rejected with the reply]
D --> F[Employee notified]
E --> FAttendance correction request: steps in text
- Employee: Request correction with a note and proposed times
- Pending · HR and line manager notified
- Pending · HR and line manager notified
- HR answers
- HR answers
- Approve Proposed times applied as manual punches
- Reject + reply Rejected with the reply
- Proposed times applied as manual punches
- Employee notified
- Rejected with the reply
- Employee notified
- Employee notified
- HR approves the request, optionally with the corrected times, or rejects it with a reply.
- You are told the answer, and a month whose payroll is finalized cannot be changed.