Set up branches and cost centres
- Product version
- Web v2.4.1
- Last updated
- 2026-11-22
Accounts Manager or Company Owner. An Accounts User can see the cost centres and choose them on entries.
- Accounting is set up: Eldalala then creates a default branch and the Main cost centre under the Company group. Set the accounting settings, payment methods and payment terms
- For e-invoices, the branch code each place is registered under at the Egyptian Tax Authority. Set up VAT and the tax registration
Steps
- 1
Open Accounting in the product bar, then Accounting settings, then Branches.
Screenshot could not be loaded- 1
- 2
Click New branch. Enter the Code, the Name and the Name in Arabic. To link the branch to a place on the HR side, choose the HR work location.
- 3
Under Address, fill in at least Address line 1, City and Country code. E-invoices from this branch carry the address.
- 4
Enter the ETA branch code (0 for the head office). Leave ETA activity code empty to use the company’s code. Click Create branch.
Screenshot could not be loaded- 2
- 5
To move the default to another branch, edit that branch and turn on Default branch. Documents and entries without a branch go to the default branch.
Screenshot could not be loaded- 5
- 6
Open Accounting settings, then Cost centres.
- 7
Click New cost centre, or Add centre under it on a group row to place the new centre inside that group.
Screenshot could not be loaded- 6
- 8
Enter the Code, the Name and the Name in Arabic. Turn on This is a group only for a centre that holds other centres: a group cannot be posted to. Click Create cost centre.
- 9
Choose the branch and the cost centre on invoices, bills, payments and journal lines from now on.
Screenshot could not be loaded- 8
If something goes wrong
| Message or symptom | What to do |
|---|---|
| This branch code is already used | Give the branch another Code. Archived and deleted branches keep theirs. |
| The default branch cannot be archived | Make another branch the default first, then archive this one. |
| Documents or entries use this branch | Click Archive instead of Delete. The branch leaves the lists for new documents and its history stays. |
| Entries use this cost centre | Edit the cost centre and turn off Active instead of deleting it. |
| This cost centre group still has centres under it | Move or delete the centres under the group first. |